back

Blog

home

Location: In China Address: Jincheng Times Square, Jinshui District, Zhengzhou, Henan Province / In Nigeria Address: Ogun State, Nigeria

What’s the Perfect Time to Launch a Cassava Processing Plant in 2026?

The ideal window to launch a cassava processing plant in 2026 aligns with post-harvest peaks and market growth momentum, making late Q2 to early Q3 the optimal time-frame. The period balances supply reliability, climatic suitability, and market growth.


cassava harvestingcassava harvesting

From a supply perspective, launching a cassava processing plant this timing capitalizes on cassava’s natural cultivation cycle—roots reach peak starch content 12–15 months after planting, with major harvests in key producing regions like Africa, Asia-Pacific, and Latin America occurring between May and August . Launching post-harvest ensures a steady supply of fresh cassava, critical since roots deteriorate within 48–72 hours of harvesting .

From a market perspective, 2026’s 4.8% projected CAGR for the global cassava market—driven by gluten-free food demand and industrial starch applications—creates a receptive landscape . By mid-year, processors can tap into rising demand for cassava-based products, as the food sector accounts for 62% of processed cassava usage and industrial applications (including bioethanol and biodegradable packaging) grow rapidly .


cassava processing plant cassava processing plant

Climatically, this period to launch a cassava processing plant avoids extreme weather risks: cassava thrives in 25–29°C temperatures, and late Q2/early Q3 aligns with optimal rainfall (1,000–1,500mm) for fresh crop availability .

Additionally, pre-launch preparations (equipment setup, supply chain partnerships) completed in early 2026 leverage Q1’s lower demand season, while launching a cassava processing plant before Q4’s holiday-driven consumption surge allows for operational refinement . For regions like Asia-Pacific (36% of global market share) and Africa, this timeline syncs with government initiatives supporting agri-processing and smallholder farmer collaborations .


small garri processing line in nigeriasmall garri processing line in Nigeria

By the way from the manufacture time and installation time of cassava processing plant, normally machine manufacture need 3-4months, then shipping need around 2months, guiding installation and do machine commissioning 3 months, total need around 8-9months to set it up. People can reference to arrange project schedule.

In summary, late Q2 to early Q3 2026 balances cassava supply reliability, climatic suitability, and market growth—positioning the cassava processing plant to capitalize on the $155.83 million projected 2026 cassava processing market while mitigating post-harvest waste and operational risks. If you have interests in cassava processing projects, welcome contact us for more discussion. Henan Jinrui, with 14 years' experience in delivering cassava processing solutions, will offer you the best factory design!

Contact list

Want to know more about our products or services? Fill out the contact form below, and we’ll to get back to you and you will get the price list. Please also feel free to contact us by email or phone.( * Denotes a required field).

  • Do you want to buy machine?
  • Yes, I want to buy machine
  • No, I want to learn more in advance.
  • What is your raw material?
  • Cassava
  • Potato
  • Sweet potato
  • Others
  • 2. What is the final product you want to produce?
  • Garri
  • Cassava flour
  • Cassava starch
  • Cassava chips
  • Attiekie
  • Bammy
  • Others
  • 3.What is your capacity plan?
  • Small scale garri machine
  • 1ton per day
  • 2tons per day
  • 3tons per day
  • 10tons per day
  • 20tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • Middle type
  • Large scale
  • What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others
Name:
Country:
E-mail*:
Tel/whatsapp:

Message: