back

Blog

home

Location: In China Address: Jincheng Times Square, Jinshui District, Zhengzhou, Henan Province / In Nigeria Address: Ogun State, Nigeria

The garri processing plant layout designed for Nigerian customer

The garri processing plant layout designed for Nigerian customer mainly includes garri cassava factory floor plan, process flow diagram and foundation equipment drawing, etc. This 2tpd garri project features a high-efficiency facility capable of processing 4 tons of cassava into 1 ton garri per hour. Below is the layout picture of garri processing factory designed for Nigerian customer by Henan Jinrui's engineer:


garri processing factory layoutcassava processing factory design for garri production

This whole set of 2tpd garri processing plant installed in Ondo State (2tpd garri project in Ondo, Nigeria), consists of dry sieve, paddle washer, cassava peeler, cassava grater, cassava pressing machine, garri fryer, and garri sieving machine.


garri 700 (5).jpggarri processing factory machines design

Upon order confirmation, We, Henan Jinrui, initiates concurrent cassava machinery production and factory layout engineering. This synchronized approach minimizes project timelines while maintaining precision.


Henan Jinrui engineer and clientHenan Jinrui's engineer and Nigerian client

Our engineers begin by analyzing the Nigerian customer’s specific requirements, cassava processing techniques, and raw material characteristics. Factors such as facility terrain, spatial constraints, and operational goals are meticulously evaluated to craft a cassava factory layout that maximizes productivity and cost-effectiveness.


garri process flow diagramgarri process flow diagram

Here are the principles our engineer followed when they designed the layout of garri processing factory:

  • To meet garri production process requirements

The garri processing factory design is tailored to the actual terrain, with equipment elevation calibrated to meet gravity-driven process flow requirements. This ensures efficient material transfer between stages—from cassava washing and grating to fermentation, dewatering, frying, and sieving and packaging.

  • Take full account of garri processing technical and economic requirements

Storage tank and pump equipment should be arranged in separate areas for easy operation and maintenance. For the equipment with pressure difference, the existing bit difference should be used as much as possible to save power consumption.

  • Take the operational accessibility and safety requirements into consideration

Garri processing plant is positioned to facilitate worker safety, ergonomic operation, and hassle-free maintenance. Clear pathways, emergency access points, and compliance with industry safety standards are prioritized to mitigate risks.

There are also other principles to be list. If you want to learn more about the layout design of garri processing plant, welcome to chat with us! Henan Jinrui, with decades of experience in cassava processing equipment across Africa, especially Nigeria, can provide similar local project cases for you!

Contact list

Want to know more about our products or services? Fill out the contact form below, and we’ll to get back to you and you will get the price list. Please also feel free to contact us by email or phone.( * Denotes a required field).

  • Do you want to buy machine?
  • Yes, I want to buy machine
  • No, I want to learn more in advance.
  • What is your raw material?
  • Cassava
  • Potato
  • Sweet potato
  • Others
  • 2. What is the final product you want to produce?
  • Garri
  • Cassava flour
  • Cassava starch
  • Cassava chips
  • Attiekie
  • Bammy
  • Others
  • 3.What is your capacity plan?
  • Small scale garri machine
  • 1ton per day
  • 2tons per day
  • 3tons per day
  • 10tons per day
  • 20tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others
  • 3.What is your capacity plan?
  • Small scale
  • Middle type
  • Large scale
  • What is your capacity plan?
  • Small scale
  • 5tons per day
  • 10tons per day
  • 20tons per day
  • 50tons per day
  • 100tons per day
  • 200tons per day
  • 300tons per day
  • Others
Name:
Country:
E-mail*:
Tel/whatsapp:

Message: