Build a Safer Grain Storage System
Factory-direct turnkey silo solution for corn, wheat and rice processing plants.
Complete Grain Storage Line
Receiving, pre-cleaning, drying, conveying, silo storage and monitoring.
Get Turnkey PriceGrain Silo System 3D Video
Turnkey Project
Design, manufacture and installation.
Reduce Grain Loss & Spoilage
Control moisture, ventilation and storage conditions to protect grain quality.
Keep Production Feeding Stable
Better conveying and discharge design helps reduce blockage and plant shutdown risk.
Improve Clean & Safe Storage
Complete pre-cleaning, silo and monitoring system for safer bulk grain storage.
Corn
Rice
Wheat
Soybean
Groundnut
Sunflower
Wheat Flour
Popato Starch
Cassava Starch
Poultry Feed
Feed Pellets
Fish Feed
Customized silo designs based on site and capacity.
Project manager supports accurate delivery.
Commissioning and hands-on operation guidance.
Maintenance guidance and spare parts support.
Tell us your country, capacity and grain type. We will suggest a suitable silo layout.
Show your capacity and location. We can suggest a similar project configuration.
Henan Jinrui is a China-based grain silo system manufacturer under Doing Group, providing design, manufacturing and engineering support for global grain storage projects.
Only 4 details needed. We reply with capacity-based solution suggestion.
Request a Solution
Get capacity-based layout, equipment list and price reference.
Or send details by WhatsApp: +86 1352661 5783